Wednesday, 29 April 2020
New coach on the way
As the man rider wagon was finished I decided to start on the newly delivered coach kit from Phil Sharples.
Monday, 27 April 2020
Just like Christmas
I had a few packages delivered over the weekend so I have plenty to be getting on with
![]() |
| A couple of Phil Sharples excellent rolling stock kits to be added to the pile. |
![]() |
| The PDF Leanne loco kit plus a remote control system from Loco Remote |
Saturday, 25 April 2020
Elevated section (and bridge) completion.
The elevated section and the trestle bridge have all now been removed, rebuilt/refreshed and reinstated.
The rail is back on and a train has been run so the railway is back in service.
The rail is back on and a train has been run so the railway is back in service.
![]() |
| For a 6 year old structure made from interior grade wood its has held up very well. |
![]() |
| Looks quite good, if a bit green in places |
![]() |
| Actually lets say its very green in places! |
![]() |
| Some of the coffee stirrer cross braces have broken. |
![]() |
| The coffee stirrers split at the ends which caused them to fall off but they are still as strong as ever. |
![]() |
| The new cross brace in place. |
![]() |
| A nice cost of preservative later and it looks nice |
![]() |
| Ready to be reinstalled |
![]() |
| With track down 'Margaret' takes the first train accross |
![]() |
| Posing on the bridge |
![]() |
| The track was soon laid on the elevated section and the train run over it several times. |
![]() |
| One last picture in the evening sun. |
Friday, 24 April 2020
Elevated section rebuild 3
The top has been put on the supports using decking board. This is far more robust that what was originally used and is treated for outdoor use. The track will go back after I have removed the trestle bridge for repair and treatment tomorrow.
![]() |
| The new top going in. |
![]() |
| All complete. |
![]() |
| Treatment added to make it look neat and helps it blend in with the background. More work will go on in this area next week. once the track is relaid. |
Wednesday, 22 April 2020
Tuesday, 21 April 2020
Elevated section rebuild
This has lasted very well for something that used materials I happened to have lying around but it has finally got to a point where it needs replacement.
The pictures show the demolition in progress.
![]() |
| This view shows the construction of the beam made of plywood with wooden blocks between them, supported on plastic pipe columns with a wooden baseboard on top. |
![]() |
| The wood on the top was recycled pallet's and has now warped beyond use. |
![]() |
| The middle of the curve used a short length of wood to bridge the gap as I didnt have enough plywood. |
![]() |
| The plywood at this end of the section was totally de-laminated and fell apart as I touched it. |
![]() |
| The chasm that will be filled tomorrow |
Monday, 20 April 2020
New Video
The Spring Running Day video has been loaded onto my YouTube channel and shows several trains running on the line in the bright Spring sunshine.