Wednesday, 26 August 2020

Getting back into the workshop

Although I am currently in the middle of my summer holiday the first week was spent in hospital due to an ongoing problem with my Gall Bladder. I am now resting at home and part of that is building a few of the large number of kits I have.

First one on the bench is this Phil Sharples 3 plank open wagon which I am trying out putting strips of paper over the marked ironwork to help hide the seams on the corners. Plastic rivets going on and paint will then follow soon.


Monday, 10 August 2020

More work done

 I have finished off a few models which will be featured soon and I have added numbers to a few models that never received them. I hope to get a few more jobs done today which will then be added here soon.

I have 2 weeks off from next week and I will get work done on the line and run some trains to video them and publish a new on train video.

Sunday, 12 July 2020

End of Lockdown

I have been back at work for 5 weeks now and my shifts have been long and finishing late so far less work has happened on the railway and associated projects. I have finished a few projects that I will add to the blog in the coming days and I am hoping to soon get the factory area started although I will have to buy the factory building before hand to allow me to set it all out correctly. Hopefully it will be done before the Autumn but, knowing me, it will probably take longer.

More will be added to the site over the next week and pages will be updated as well as I have some dead links to remove.

A new coach

Another lockdown project is this Phil Sharples 4-wheel coach

The kit with its main parts glued together and receiving a coat of watered down PVA.
The coach slowly gaining some colour.
The body now has its colour and the seats and buffer blocks are now red
3 new characters are being painted with the 2 in the background going into the coach.
The main structure is complete
The passengers are in place
The glazing is in so I can now fit the roof struts
The roof is going on
The coach in its current form. I will try to complete it this week.

Wednesday, 20 May 2020

Making the most of time on my hands

The Phil Sharples bow ended wagon is finished.

   
The body is quickly put together and the fake axle boxes prepared for painting.
 
Colour going on the truck
 
Rivets (not included in the kit) going on the strapping.
 
The wagon is on its wheels and ready for the false axle boxes to be added
 
After being painted the strapping is glued in place
 
Once the glue sets the wagon is done.
 
Ready for service





 


Wednesday, 13 May 2020

Latest lockdown update

I do hope that everyone is keeping well during this time, a hobby is essential in my case to keep sane. I have had plenty of DIY and gardening jobs to do plus a large plastic box full of railway related kits to be getting on with. I am trying to clear my worktop so I can do a video about building a kit plus I need to get on with sorting out my cosplay of Mad Eye Moody so I have plenty to do.

My latest update in pictures:
A new kit on the bench

The chassis is quickly assembled

The top rails roughly put into position.

The wood has been given a nice dose of distressing.

Some watered down india ink has been applied

The running gear gets a coat of rust

With the wheels in place a slate load is tried for size
 
The wagon completed and ready for action.
 
Another Phil Sharples kit and this one is a bit more detailed than the others

The kit of parts
 
The chassis comes together quickly.

Monday, 4 May 2020

New wagon and a non-railway item

I am slowly getting on with building some of my kits and one of my older wagons now has its load.


A Phil Sharples hand cart kit in all its glory

The parts are accurately cut out and hold together nicely without glue. 

Obviously glue is needed as well as a coat of watered down PVA glue to seal the wood.

The paint slowly goes on

The finished model although it will get some graphics soon.

This broken tipper wagon chassis will be a load for flat wagon 11

A set of supporting timbers are first fabricated

The supports are glued down

Ink is used to stain the suppprts

The load and some chains are added and no. 11 is ready for service.