Wednesday, 11 May 2016

Hythe Pier Narrow Gauge Railway

On the 8th May my Wife and I visited Hampshire to go to Beaulieu Motor Museum. Once our visit was over we wanted some fish and chips so we headed to Hythe where our cravings were sated. It was then that I realised we had been in Hythe before and rode on the pier railway so we went to have a look.

A view of the rear of the train with its luggage carrying flat wagon and the drivers cab. 

The purpose of the railway is to take passengers to the end of the pier to catch the ferry. Not the ferry in the picture, thats on its way to the Isle of Wight.

The luggage flat in action

As the train moves off the locomotive comes into view. It is electrically powered and still uses the original electronics. 

A view of the full train on the pier

The train on its way back to the landside

A nice view of this wonderful old train.

Sunshine at last

The summer appears to have arrived a bit early with lovely sunshine, high temperatures and no rain! This has allowed me to get on with the tramway extension and start the landscaping.
The pictures tell the story.

The first section of wooden edging goes in

The area between the main line and the tramway starts to get its landscaping

Getting there slowly. Some plants have gone in with two spreading plants that should cover a lot of the ground currently covered with slate.

I have put in a basic road way to allow a lumberjack yard to be built

Extra blocks have been laid, to put more in I will have to dig more of the trench

Work stopped for a while when I heard a low droneing which turned out to be the local bee keepers hives swarming. Whilst I like bees and understand they dont normally sting these sounded a bit pissed-off so I retired indoors.

Once the bees had gone I continued adding a car that we bought a year or so ago. Scale vehicles will follow but this little fellow will do for a while.

Friday, 29 April 2016

Construction progress & tipper wagon

The tramway extension is slowly coming along, the weather has been unkind just lately so progress is slow.
Weather has been rather iffy

The point removed. White powder is ant killer as there was an ant nest under the point.

Blocks in place, track will follow when I get fishplates.
The railway has gained two new tipper wagons build from Phillip Sharples kits. The pictures tell the story.
The chssis is a simple box with the wheels running in a specially printed plastic holder that forms a side of the box.

The chassis completed

And with wheels in place

The body begins to take place

The body supports in place under the body
 
The chassis is painted and the body is complete with its working door.
 
Body and chassis together and ready for finishing.
 
Complete and ready for weathering.





Friday, 1 April 2016

Sunny Easter

I had a short running session with the Brunel and the Steeple Cab. I videoed the Steeple cab and put a short video of it in the video page.

I am going out shortly to buy more materials for the mine tramway extension, hope to get some track down by Monday.

The Brunel brews up

Out in the garden and running well

On the trellis

Another shot on the bridge

The Brunel cools down whilst the Steeple cab runs a short goods out of the station

Another one on the trellis

Back into the station.

Thursday, 24 March 2016

Mine tramway begins

The new section of the railway, the mine tramway, has now been started. This morning it was nice and dry after a coupe of weeks of mostly dry weather and I got the initial trench dug and the hardcore in.
Rain stopped play and now it looks like tomorrow will be the last chance over Easter to get the concrete base in place.

The initial trench is dug

Wooden stakes are driven in and leveled to the height of the concrete base.

Hardcore in, just the concrete to go
In the workshop several projects are nearing their completion and will be featured here soon.

Monday, 21 March 2016

Spring is coming.

The weather has warmed up nicely and is staying mostly dry so thoughts turn towards getting some more work on the line start to cross the mind.

I will be starting the mine tramway branch this weekend and the foundations of the Treacle Factory as well. This will give me some more siding space and begin phase 2 of the railway.

The station platform has not survived the winter very well and will be replaced with some slate floor tiles that a friend gave me with the original slate paving slabs along the edge of the platform. Hopefully that will be done in the next couple of weeks.

Work is still going on on the workshop with lots of projects either well in hand or waiting space on the workbench.

A new cab ride video has been added to my YouTube channel with a new one planned for the end of May when the new construction will be complete. 

Sunday, 28 February 2016

Quick Update

The cold weather has left the workshop unusable so very little has been happening. A spell of warmer weather has, however, allowed me to get started on the new Hunslet Quarry loco from PDF Models.