The Merrytwit Light Railway is a 16mm scale, 32mm gauge model railway located in my Essex back garden and this is its official home on the internet.
Tuesday, 28 October 2014
Sunday, 26 October 2014
Monthly update - October 2014
I have decided to try and do a monthly update as the ad hoc ones are getting further and further apart.
The main loop is complete and several runs have been made over it although lack of time and the weather have curtailed any real running.
I did manage to do a cab ride video, this is in the video section and will be replaced as further developments take place.
The workshop has been cleared so I can now reach everything again. I still need to put an insulated ceiling in. I have a few spare rest days coming up when I will be able to make a start on this.
And now a few pictures:
The first run was going to be done by no. 2 but a problem with the drive becoming un meshed has occurred and a fix for this problem will be carried out.
The cab ride can be viewed here. Its a bit noisy and I didnt get the camera very level but it gives you an idea.
The main loop is complete and several runs have been made over it although lack of time and the weather have curtailed any real running.
I did manage to do a cab ride video, this is in the video section and will be replaced as further developments take place.
The workshop has been cleared so I can now reach everything again. I still need to put an insulated ceiling in. I have a few spare rest days coming up when I will be able to make a start on this.
And now a few pictures:
![]() |
| A little visitor to the line |
![]() |
| He didnt like the drill |
![]() |
| The last panels of track are added |
![]() |
| The Chief Engineer see off a test run by no. 1 |
![]() |
| Leaving the station over the footpath crossing |
![]() |
| Negotiating the point work to at the Mine Tramway Junction |
![]() |
| Across the removable footpath bridge |
![]() |
| Over the raised section |
![]() |
| Heading back to the station |
![]() |
| Across the trestle bridge |
![]() |
| And back to the start again |
![]() |
| The only other run that occurred was using No. 1 as a camera vehicle |
Tuesday, 30 September 2014
Main circuit completed at last
Tuesday, 16 September 2014
Track panels delivered
Friday, 5 September 2014
Trackbed Completed
Over the last few days the trackbed has been completed and a coat of preservative has been put on it to protect it. Now there is just the top layer of preservative to be put on and then the track to lay and the loop of the railway will be complete.
![]() |
| Work in progress and the beam is leveled and the legs are driven into the ground. No concrete as I dont want to damage the roots of the shrubs. |
![]() |
| The beam from the trestle bridge in place and leveled |
![]() |
| The other beam is getting its wooden trackbed fitted |
![]() |
| A small gap |
![]() |
| A visitor overhead. We live near to North Weald airfield and it is not unusual to be buzzed by spitfires and gnats. |
![]() |
| All in place and waiting for a coat of preservative. |
Tuesday, 26 August 2014
Lets talk weather
No progress has been made on the railway mostly due to the weather but also due to other commitments like going to the BTCC at Snetterton and having a meal on the train at the Great Central railway with my daughter as part of my birthday present.
I will be doing a proper update soon and adding pictures from my holiday as well as from the great central soon.
I will be doing a proper update soon and adding pictures from my holiday as well as from the great central soon.
Tuesday, 5 August 2014
Another gap bridged.
The new removable bridge has had plank work added to it and received a good coat of preservative. It will eventually get handrails as well.
| The new bridge in place complete with trackwork. |
| No. 2 gets the job of testing the bridge, she approaches with caution |
| On the bridge and everything is fine with the low slung buffer beams easily clearing the planking. |
| She ran right across to the current limit of the line. |
| The rails are held in alignment using an old OO gauge trick with stiff wire, in this case the shanks of pop rivets, in copper tube soldered to the rails. |
Subscribe to:
Posts (Atom)



















