Job list for the spring

I have been having a think about jobs to be done this spring so that I can get a summers worth of running in.


  1. Re-lay the station area to get room for the engine shed. I am thinking of having an island platform and lengthen the entry paths into the station area.
  2. Build the platform
  3. Concrete section below the engine shed, landscape the yard area using an ash mixture of postcrete and ballast the rest using postcrete.
  4. Lengthen the two block sections leading into the raised section ready for a new curved trestle bridge.
  5. Lay the base for the factory area and get track down. The buildings will be built during the year.
So that is the main list and doesnt include the building and painting of new stock.

Lets hope we have a nice spring and summer with plenty of dry weather.