Station Progress

I have finally finished building the block base to the station and have put a layer of earth in the bottom to even it up. Once tamped down a layer of hardcore will be added followed by a few bags of sub base to give a nice level surface ready for concrete.

The base wall ready for infilling with hardcore and concrete.