Station progress

I got just over half the foundation concrete for the station in, the 30 degree temperatures stopped be going any further as I was just a ball of sweat and quite de-hydrated. Hopefully I will get the rest done sometime this week leaving Sunday to get the blocks mortared in.

The blocks are just placed on the dry concrete to make sure it is all level