Sunday 5 September 2021

All Change

 Several things have been happening with the railway the first being that I have built a set of portable boards to build a garden railway on tour. Track is now being lifted from the garden ready for its rebuild later in the Autumn and then Spring. 

The baseboards assembled in the garden. No joints between boards are done up tight as the garden is very uneven and I couldnt get it flat.

The boards had a coat of matt green.

The boards were used at the North Weald and District Miniature Railway's Model Fest but had an oval of 45mm gauge track on so a friend could run his stock. This was down to the fact that I had my gall bladder removed and they had to open me up so I was unable to do very much. Hopefully in a week or so I will be able to get track down and trains running.

As sitting and leaning forward has been painful for me recently I have not been able to use my down time to get kits built however I can now do so for short periods so I will get on with it and get some videos made of the construction.

I did get trains running at the Model Fest using my test track. Whilst it is not the best to display with I did get things running and it attracted lots of kids who loved it when Wallace and Gromit went for a run.

Dan Foards gauge 1 trains doing their thing

The test track with W&G featuring.